What to measure for a fence install
Linear feet is the headline; post count is what you actually pay for.
5 min read
Fencing quotes in linear feet, and linear feet is the wrong number to build a price from on its own. Posts are what you actually pay for — in material, in concrete, and in the hours it takes to dig.
| Measurement | What it is | What it drives |
|---|---|---|
| Linear feet | Total run of fence | Panels or pickets, rails |
| Height | 4 ft, 6 ft, 8 ft | Post length, picket length, concrete |
| Corners | Direction changes | Corner posts (heavier than line posts) |
| End posts | Terminations | End posts, caps |
| Gates | Count and width each | Gate kit, hinges, latch, gate posts |
| Terrain | Flat, sloped, rocky | Labor, racking vs stepping |
| Post spacing | Usually 6 or 8 ft | Post count, concrete |
Post count is a derived number, and it has a plus one
At 8-foot spacing, 200 feet of fence is 200 ÷ 8 = 25 — plus one, because
a run needs a post at both ends. Twenty-six. Corners and gates add more, since each
needs its own. Forget the plus one on every run of a big job and you are short several
posts and a bag of concrete each.
Gates cost far more than the fence they replace
A 4-foot gate is not 4 feet of fence. It is two heavier posts set deeper, a frame, hinges, a latch, and the time to hang it so it still swings true in a year. A double drive gate more so. Count gates separately and price them separately — burying them in linear feet is how a job loses money.
Slope: rack it or step it
On a grade you either rack the fence to follow the ground or step it down in level sections. Racking suits pickets and looks continuous; stepping suits preassembled panels and leaves triangular gaps at the bottom. Both cost more labor than flat ground, and the customer has an opinion — so decide it at measure time, not on install day.
Two things to note that aren't measurements
Where the line is. A fence on the wrong side of a boundary is a fence you take down at your own cost. Note who confirmed it.
What's underground. Utility locates before digging, every time. It is a scheduling dependency, so it belongs on the job, not in someone's head.
Keep reading
How a package turns measurements into a materials list
The one concept that makes the rest of the estimate build itself. Read this first.
What to measure on a roof, and what each number is for
Every field on the roofing measurement report, and why it's there.
Why Good, Better, Best closes more jobs
The pricing structure, and why three tiers cost almost nothing to offer.
What to measure for siding, and what each number is for
Wall area, openings, corners and trim — and the deduction rule that trips people up.
What to measure for gutters, and what each number is for
A short list, taken from the ground, that prices a job on the spot.
What to measure for window replacement
Why a window job is a list of openings, not an area — and what breaks when it's wrong.
What to measure for a deck build
Area, railing, stairs, footings — and why framing drives more cost than decking.
ExteriorPro does this arithmetic for you
From $199 a month per location. All six trades, unlimited users, 30-day free trial.
Start your free trial